Laserfiche WebLink
<br />Pmks & Recreation <br />MimItes 09-04-02 <br /> <br />$26..000 Charitable Gamblin2 Funds <br />Committee Member Pei1 submitted a letter to the committee from the Centerville Lions <br />Club which states the Lions have contacted the Architects for-Bruggeman Companies to <br />start a couple of design scenarios for expanding and remodeling of the existing park <br />building, located at Laurie LaMotte Park. Hopefully, these plans will be presented to the <br />Parks & Recreation Committee at the October Meeting. Committee Member Peterson <br />presented a tentative drawing, with dimensions of 40 x 50, of a poSSIble design plan. for <br />the warming house. These ideas were discussed by the committee and will be given to <br />the architects. <br /> <br />Motion was made by Committee Member Lee, seconded by Chairperson DeVine, <br />to recommend to council the designation of the approximately $26,000 charitable <br />gambling funds to renovate the existing warming at Lamie LaMotte Park. All in <br />Favor: Motion passed unanimously. <br /> <br />Chairperson De Vine questioned whether the roof on the ClUTent. warming house could <br />just be patched for now, opposed to replacing the root: and isn't this a mainte~. <br />issue that Public Works should be looking at instead of the Parks & Recreation < , <br />Committee. <br /> <br />Vll. UPDATES <br /> <br />Skate Park. (Monthly Review\' . <br />There are still residents questioning why the half-pipe has not been instaJled at Wheels <br />Park. Chairperson De Vine will discuss it with Paul Palzer. . <br /> <br />Bonestroo Trail MaDIEDC New Resident Packet <br />This item was tabled until the next scheduled committee meeting as Chairperson <br />De Vine has not met with EDC Members Scheller and Terway. Committee Member <br />Walter has taken some digital pictures of local parks and Committee Member LeBlance <br />will take some trail pictures. <br /> <br />Acorn Creek Park Trail Repair <br />The Acorn Creek Trail still needs work. The trail is leaking under the pipe and eroding <br />the trail. Committee Member Peterson reported the developer needs to pump concrete in <br />and around the pipes to stop the erosion. The City Engineer has not signed off on this <br />project. In working on the trail the developers has broken up two sidewalk panels and <br />dirt keeps nmning off onto the trail. This section of the trail is being handled through the <br />developer, the City Engineer and Rice Creek Watershed. <br /> <br />4of5 <br />