My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-02 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2007
>
2007-05-02 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2007 3:14:37 PM
Creation date
4/27/2007 3:14:16 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Parks &; Recreation Committee <br />Meeting Minutes April 4, 2007 <br /> <br />InC. bas since purchased the Interlock Company and the equipment is being manufactured in Canada. <br />The City of Minneapolis is very happy with the product and bas not had any problems with the climate. <br />It was recommended, however, to ensure that a graffiti resistant material was applied to the concrete. <br />Mr. Lehman was asked whether this was an additional cost or a standard feature, but we did not have <br />an answer at the time of the meeting. The committee made the following recommendation, but would <br />like to add the cost of the graffiti resistant coating if there is an additional charge. <br /> <br />MotioD was made by Committee Member Rarris, seeoDded by Viee-ChairpenoD AmaodseD to <br />reeommeDd to the City CoaoeD aeeeptaDce of the bid from SpohD Raoeh, IDe. through <br />Mbmesota WlseooslD Playgroaod, IDe. for the purchase aod delivery of three (3) SpohDcrete <br />pieces of skate park equipmeot Dot to exceed $17,474 with additiooal charges for CraBe reDtal <br />when that service is secured, aod the cost of the graffiti resistaot coatiog if there is ao additioDaI <br />charge. AUlD favor. MotioD carried onsmlmously. <br /> <br />Tneie McBride Memorial Park ReDovadons <br /> <br />Included in the packet was information on the play structure and shredded tire material that was used in <br />Laurie LaMotte Memorial Park, dollar amounts and companies the City received bids from. Also <br />included was research that was done in 2002 for Tracie McBride Memorial Park. It may be helpful <br />with the current renovation plans for the park. <br /> <br />This item was discussed under A~ces. <br /> <br />1601 LaMotte Drive Park ImDrovemeDts <br /> <br />ChaJrpenoD Seeley suppUed a Ust of items that Deed to be addressed iD April, which iDcluded the <br />foUowiDg: locate utilities, move the fence, move the lilacs bushes, meet with the DNR Forester, tag <br />the trees for removal, determine replacement or new locations for pine trees from Eagle Park, <br />determine what work will or can be done by Public Works and/or volunteers, determine from on-site <br />inspection the location of trails, benches, water fountain, grills, bike racks, determine permit <br />requirements for locating the artesian spring, who will do it and whether bids are needed, outline plan <br />for shoreline erosion abatement determining grading needs, research/apply for shoreline erosion <br />abatement grants, outline plans for rain gardens and swale, also determining grading needs, applying <br />for rain garden grants, and determining signage needs <br /> <br />Viee-ChairpenoD AmDDdseD supplied a bid list which was discussed aod will be submitted to the <br />City EogiDeer. All items were included, although some may be completed by Public Works, <br />volunteers or the City will contract smaller items out like tree removal and signage. Also, as costs are <br />determined, some items may be completed in phases. <br /> <br />Also suppUed was information prepared by Mr. Greg Thompson, Urban Conservation SpeelaUst, <br />Association of MetropoUtan SoD .. Water Conservation Districts. FoUowiDg is correspondence <br />from Mr. Thompson, reprdlng the plans and bids. <br /> <br />A.ttached is a PDF plan set (grading, erosion-control & planting plans) for the Centerville Lake Park <br />project. I have also attached a cost estimate for the individual projects (Shoreland Buffer & Small <br />Raingarden; Bioretention for Street Runoff; Vegetated Swale) that have all the materials listed and the <br /> <br />4of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.