My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-09 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-05-09 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 3:35:30 PM
Creation date
5/4/2007 3:34:57 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, ~ <br />~ . <br /> <br />2335 Highway 36 W <br />St. Paul, MN 55113 <br /> <br />Tel 651-636-4600 <br />Fax 651-636-1311 <br /> <br />www.bonestroo.com <br /> <br />April 19, 2007 <br /> <br />.. Bonestroo <br /> <br />Dallas Larson <br />City Administrator <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038-9794 <br /> <br />Re: 2009 Street and Utility !mprO'lement5 Project <br />Engineering Scope and Fee Proposal <br />Bonestroo Temp, File #000616-07000-0 <br /> <br />Dear Dallas: <br /> <br />The purpose of this letter is to outline the process by which the City could begin to engage the public in <br />discussions regarding the proposed 2009 Street Reconstruction project. <br /> <br />History <br />In 2003, the City commissioned a Pavement Management Study which evaluated the condition of all streets <br />in town and set a recommended schedule of improvements including, seal coats, overlays, and <br />reconstructions. Also considered in the study, were streets which were not yet serviced with City water <br />main. Street improvement projects were proposed to coincide with those utility installations. <br /> <br />The study proposed two seal coat projects, one in 2004 and the other scheduled for 2006. In 2004, the city <br />seal coated most streets recommended for said improvements in that year. The streets scheduled for seal <br />coating in 2006 have not yet been completed. <br /> <br />The study also laid out two street improvement projects, one scheduled for 2004, and the other for 2009, <br />In 2004, the city undertook a larqe street and utility improvement project covering most streets desiqnated <br />for that year by the study. <br /> <br />Feasibility Study <br />In order to ensure recommendations of the 2003 study are still appropriate four years later, it would be <br />worthwhile to reevaluate all streets not reconstructed as part of the 2004 project. A feasibility study should <br />be ordered by the Council to do the following: <br /> <br />. Evaluate the condition of all streets not reconstructed in 2004 and older than 3 years, The City <br />Engineer, with the Public Works Director should conduct this investigation, <br /> <br />% <br /> <br />St. Paul <br />St. Cloud <br />Rochester <br />Milwaukee <br />Chicago <br />
The URL can be used to link to this page
Your browser does not support the video tag.