Laserfiche WebLink
<br /> <br />CITY OF CENTERVJLLE <br />IIONTHL Y ENGINEER'S REPORT <br />For May 9, 2007 City CouncU. Meeting <br /> <br />Italics = New information. <br />Normal = No c:baop ti'om last report. <br /> <br />1. Pheasant Mania 3rd Addition (000616-03134-0). The Contractor bas a couple punch list <br />items fOII)Jlillil\s. They need to finish additional grading to lower the pond elevation and clean <br />out some Oared end sections. James R. Hill is working with the Developer and the Contractor <br />on geUing a schedule to complete the work. The COIItrt#tOr Is worldng 011 SI.IInnItttng new <br />televising tapes and reports qfter cleaning the Sanitary Sewer 1tnes,. Developer's Engineer hDs <br />submitted the Record Pion Drawingsfor our review. <br /> <br />2. Runten Crossing 3rd Addition (000616-05141-8). Volk Construction bas returned back from <br />their winter lay-ofF and has told us they will be seheduUllg the work of clea-nUts and re- <br />televising the Sanitary Sewer lines. All quantities have been agreed on to date with the <br />Contractor and payment has been made. The Record Plan Drawinp have been completed by <br />Bonestroo and will be turned into the City this week. The Developer is working with the <br />builder to restore some erodMl areas 011 the project site. They are also worIdng with a resident <br />in completing the restoration of their yard <br /> <br />3. 21st AVeD~ Road (088filW51G-O). As soon as conditions on the site are workable <br />the Contractor would like to start construction immediately. The Contractor has to install the <br />additioDal storm sewer and finish building the ren1ltining roadway. The Baclrap Road is still <br />currently blocked of[ <br /> <br />4. CSAB 14 (000616-04139-0, 000616-06144-0,000616-06150-8). <br /> <br />Forcen...... <br />Final plans and specs hove been submitted. <br /> <br />Water Main <br />Final pions and specs have been submitted <br /> <br />~treetseane <br />Final plDns and specs have been suInnUted. <br /> <br />5. 2006 Storm Water Analysis (000616-06146-0). On hold until the 2009 Street Project is <br />better defined. <br /> <br />6. Old MID Road IDlprovements (000616-06147-8). Plans and specs are being completed. <br /> <br />7. FairvIew Street IDaprov_euts (080616-86141-0). Bids wiD be received 011 May t1'. <br /> <br />8. Block 7 Redevelopment Grading and Utility IDlproveDleDts (000616-06152-0). All <br />underground installation is completed. Contractor has started their punch list wtri They have <br />completed the project grading and all punch list items other than their 1III1TIIIrel and air test on <br />thtl Sam"" .~r. <br />