My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-09 Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-05-09 Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2007 3:57:58 PM
Creation date
5/9/2007 3:57:42 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />9. Centerrille TOWDofliee Park r- Addition (000616-06152-0). We have approved the revised <br />pions and construction hils begun. <br /> <br />10. "au7.aI's Addition (000616-06154-0). On hold until the Old Mill Road improvements ore <br />approved. <br /> <br />11. IDdden Spring Park (000616-07155-0). Shop drawings for the pavilions have been approved. <br /> <br />Pions and specs are being completed for the pork improvements. A bid date of Mil)' 2r has <br />been set. The plans include gravel trails, tree removal. rain gardens, stream bank restoration <br />an arteskm weUjeature, meandering stream. benches, bl. racb and other parkfumishlnga. <br /> <br />1%. Downtown Overhead Power Relocation (000616-07156-0). Easements and right-of-way on <br />Clearwater Street have been staked. Xcel will have tree trimmers in to dear trees in those areas <br />shortly. City staff is working with the County on easements on the Chauncy Barrett property. <br /> <br />13. eo.preheDSive Pin (000616-0'115'-8). Work bas begun on the background report to be <br />presented on June 5th. <br /> <br />14. ~Ia.eeus <br />. We submitted a scope of services and engineering proposal for the production of a <br />Downtown Redevelopment Comprehensive In&astructure Plan. This would lay out, <br />conceptually, the sewer, water, storm water, and street systems to allow continuity and <br />reliability of theses systems as they are designed and constructed in phases. Included <br />with this proposal is a separate estimate to complete an EA W if it is necessary. This <br />proposal also now includes topoarapbic survey work. <br />. We have submitted a scope of services to take the 2009 street improvement project <br />through the public hearing stage. <br />. We are working with the Public Works department to shape a pond and ditch <br />maintenance poHey/plan and vmuaJ budpt. <br /> <br />- Ettd ofmemo- <br />
The URL can be used to link to this page
Your browser does not support the video tag.