My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-23 CC Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-05-23 CC Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2007 12:56:00 PM
Creation date
5/24/2007 9:16:30 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />demonstrate that the Project has been analyzed according to appropriate space and needs <br />standards. Any substantial changes to such predesign package must be submitted to the <br />Commissioner of Administration for the State of Minnesota for review and comment. <br /> <br />C. If the Proj ect includes the construction of a new building, substantial addition to <br />an existing building, a substantial change to the interior configuration of an existing <br />building, or the acquisition of an interest in land, .then the Public Entity shall not prepare <br />final plans and specifications until it has prepared a program plan and cost estimates for all <br />elements necessary to complete the Project and presented thel)1 to the Chairs of the <br />Minnesota State Senat~ Finance Committee and Minnesota House of Representatives Ways <br />and Means Committee and the chairs have made their recommendations, and it has notified <br />the Chair of the Minnesota House of Representatives Capital Investment Committee. The <br />program. plan and cost estimates must note any significant changes in the work to be <br />performed on the Project, or in its costs, which have arisen since the appropriation from the <br />legislature for the Project was enacted. or which differ from any previous predesign <br />submittal. <br /> <br />D. The Public Entity must no~fy the Chairs of the Minnesota State Senate Finance <br />Committee, th~ Minnesota House of Representatives Capital.Investment Committee and <br />the Minnesota House of Representatives Ways and Means Committee of any significant <br />changes to the program plan and cost estimates referred to in Section 6.10.C. <br /> <br />E. The program plan and cost estimates referred to ~ Section 6.10.C must ensure <br />that-the Project will comply with all applicable energy conservation standards contained in <br />law, including Minn. Stat. ~~ 216C.19 to 216C.20 that exists as of the date of this <br />,Agreement and as such may subsequently be amended, modified or replaced from time to <br />time, and all rules adopted thereunder. <br /> <br />F. If any of the Grant is to be used for the construction or remodeling of the <br />Facility, then both the predesign package referred to in Section 6.1 O.B and the program. plan <br />and cost estimates referred to in Section 6.10.C must include provisions for cost-effective <br />information technology investments that will enable the occupant of the Facility to reduce <br />its need for office space, provide more of its services electronically, and decentralize its <br />operations where such provisions are deemed necessary by the Information Policy Office of <br />the Department of Administration for the State of Minnesota. <br /> <br />G. If the Project does not involve the construction of a new building, substantial <br />addition to an existing building, substantial change to the interior configuration 'of an <br />existing building, or the acquisition of an interest in land, then prior to beginning work on <br />the Project the Public Entity shall just notify the Chairs of the Minnesota State Senate <br />Finance Committee, the Minnesota House of Representatives Capital Investment <br />Committee and the Minnesota House of Representatives Ways and Means Committee that <br />the work to be performed is ready to begin. <br /> <br />'H. The Project must be; (i) completed in accordance with the program. plan and <br />cost estimates referred to in Section 6.10.C, (ii) completed in accordance with the time <br /> <br />" <br /> <br />Generic GO Bond Proceeds <br />Grant Agreement for Construction Grants <br /> <br />21 <br />RDGP-07-0004-o-FY07 <br /> <br />Ver- 1212006 <br />(Gnrc'GO GA-Cnstrctn Gmt) <br />
The URL can be used to link to this page
Your browser does not support the video tag.