Laserfiche WebLink
<br />City of Cenwrville <br />Public Works Facility <br /> <br />The owner's architect/engineer would provide us with the topographic survey and current drawings of the <br />site (in AutoCAD format) We would design the site. Site elements to be considered in the design are <br />· SaltJSand storage <br />· Fueling Slat ion <br />· Parking and traffic circulation <br />· Future Water Treatment PlantlWells and related water mains <br />· Utilities (sewer and water) <br />· Storm Sewer <br />Subtotal fee Estimate: $6, 000 <br /> <br />· Ponding or other drainage features <br />· Grading, drainage and erosion control <br />· Wetland impacts and mitigation (permitting not included) <br />Subtotal fee Estknate: $9, 000 <br /> <br />Option 2 Total Fee estimate S 15,000 <br /> <br />Items not included in the fees listed above are <br />· Supplementary PreliminalY Survey work <br />· Permitting <br />· Construction services (staking and inspection) <br />· Landscaping design <br />· Bidding/Contracts <br />· Easements <br />· Platting <br />· Improvements to Cedar Street <br />· Plarmlng review (setbacks, etc.) <br /> <br />These items could be added to the scope if the council felt it was appropriate. <br /> <br />Please call with any questions <br /> <br />Sincerely, <br /> <br />BONESTROO <br /> <br />~~-?'";:;4 ~ <br /> <br />;'v1ark Statz, PE <br />City Engineer <br />651-604-4709 <br /> <br />copy: GFU, TJM, file <br /> <br />Page) <br />6/8/0/ <br />