My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-07-11 Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-07-11 Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2007 1:16:43 PM
Creation date
7/18/2007 1:16:14 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />proposed action, but failure of the City to do so will not affect the Developer's and City's rights <br />or obligations hereunder. If the Developer does not reimburse the City for any cost the City <br />incurred for such work within ten (10) days, the City may draw down on the Security or <br />Additional Security to pay any costs. No development, utility or street construction will be <br />allowed and no building permits will be issued unless the Developer is in full compliance with <br />the approved erosion control plans. The City will not unreasonably withhold permits. <br />The Developer shall require all subcontractors working on grading, structural exteriors or <br />who will moving vehicles across unimproved surfaces to comply with Centerville erosion control <br />standards. The Developer shall educate these subcontractors about the City standards and these <br />subcontractors shall be required to post surety to secure performance. <br />13. GRADING PLAN. The Plat shall be graded in accordance with the Grading <br />Plan.\ Within thirty (30) days after completion of the grading and before the City releases any <br />Security, the Developer shall provide the City with an "as constructed" grading plan certified by <br />a registered land surveyor or engineer that all ponds, swales, and ditches have been constructed <br />in accordance with the approved grading plan on public easements or land owned or to be owned <br />by the City. The "as constructed" plan shall include field verified elevations of (a) cross sections <br />of ponds, and (b) location and elevations along all swales, wetlands, wetland mitigation areas if <br />any, and ditches, and the Developer shall require lot purchasers to comply with the City's <br />development standards for verifying lot comer elevations and house pads. The City will <br />withhold issuance of building permits until the approved certified grading plan is on file with the <br />City and all erosion control measures are in place as determined by the City Engineer. The <br />Developer shall be required to maintain all erosion control measures until the project is accepted <br />by the City. No structure shall be occupied until a final inspection of the grading is found to <br />match the "as constructed" grading plan. <br />14. DEWATERING. Due to the variable nature of groundwater levels and <br />stormwater flows, it will be the Developer's and the Developer's contractors and subcontractors <br />responsibility to satisfy themselves with regard to the elevation of groundwater in the area and <br /> <br />Hanzal Development Agreement v91.docHIHlJ1llll Develepmem Ageem.eat ";98 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.