My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-07-11 Set Agenda & Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2007
>
2007-07-11 Set Agenda & Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2007 1:16:43 PM
Creation date
7/18/2007 1:16:14 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10. TIME OF PERFORMANCE. The Developer shall install all Developer <br />Improvements set forth in the Plans by December I, 2008. Publie Improvements, 'With the <br />&XooptiOB of the final wear eourse ef asphalt OB streets shall be eompleted by Deeember 1, 2007. <br />The mal '.~ar eourse OB streets must be installed no later than Deeember 1, 2008. The <br />Developer may, however, request an extension of time from the City. If an extension is granted, <br />it shall be conditioned upon updating the Security posted by the Developer to reflect cost <br />increases and the extended completion date. Final wear eourse plaeemoot outside of this time <br />frame must have the \vrltten appro';aJ. of the City Engineer. <br />11. LICENSE. The Developer hereby grants the City, its agents, employees, officers <br />and contractors a license to enter the Land to be platted to perform all work and inspections <br />rCa!:lonably deemed appropriate by the City in conjunction with the Plat development and the <br />Improvements. <br />12. EROSION CONTROL. The erosion control shall be implemented by the <br />Developer according to the Grading Plan and inspected and approved by the City. The City or <br />Rice Creek Watershed District may impose additional erosion control requirements if field <br />conditions warrant. All areas disturbed by the excavation and backfilling operations shall be <br />reseeded within forty-eight (48) hours after the completion of the work or in an area that is <br />inaCtive for more than seven (7) days, unless authorized and approved by the City Engineer. <br />Except as otherwise provided in the erosion control plan, seed shall be in accordance with the <br />City's current seeding specification, which may include certified oat seed to provide a <br />temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, <br />and disc anchored as necessary for seed retention. The parties recognize that time is of the <br />essence in controlling erosion. If the Developer does not comply with the erosion control plan <br />and schedule or supplementary instructions received from the City or the Rice Creek Watershed <br />District, the City may-take such action as it deems appropriate to control erosion. The City will <br />designate a contact person responsible for erosion control issues. The contact person will attend <br />the pre-construction meeting. The City will endeavor to notify the Developer in advance of any <br /> <br />Hanzal Development Agreement v91.docHa.nmJ Deyelel3meat Agreemeat ';<)8 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.