My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-04 P & Z Handout
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2007
>
2007-09-04 P & Z Handout
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2007 6:15:04 PM
Creation date
9/4/2007 6:14:12 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Permit Application No. 07-083 <br /> <br />ARC Builders <br /> <br />Administrati ve <br /> <br />5. Draft legal document with satisfactory form and description <br />granting ponding and flowage easements over all onsite ponds, <br />wetlands, and other hydrologic features. <br /> <br />6. Draft Declaration for Maintenance of Stormwater Management <br />Facilities acceptable to District engineer and attorney for <br />proposed onsite storm water management features. <br /> <br />7. Copy of receipt from County Recorder and signed/notarized <br />legal document(s). Note that legal document(s) are to be <br />submitted by Applicant to County for recording only after <br />approval by District. <br /> <br />8. Copy of MPCA NPDES permit application. <br /> <br />9. Surety in the amount of$5,000. <br /> <br />Stipulations: <br /> <br />I. An as-built survey of all stormwater <br />management BMPs (ponds, rain gardens, <br />trenches, swales, etc.) is to be submitted to the <br />District for verification of compliance with the <br />approved plans before return of the surety. <br /> <br />Exhibits: <br /> <br />1. Permit Application dated August I, 2007, received August 2, 2007. <br /> <br />2. Hydrologic Calculations withsubwatershed boundary maps prepared <br />by Passe Engineering, Inc., dated August 2,2007, received August 2, <br />2007. <br /> <br />3. Infiltration Worksheet prepared by Passe Engineering, Inc., undated, <br />received August 2, 2007. <br /> <br />4. Floodplain Fill and Compensatory Storage Calculations prepared by <br />Passe Engineering, Inc., undated, received August 13,2007. <br /> <br />5. Geotechnical Soil Borings prepared by Braun Intertec Corporation, <br />dated July 27,2007, received August 2,2007. <br /> <br />6. Wetland Delineation Report prepared by Miller Environmental, Inc., <br />dated July 24, 2006, received August 2, 2007. <br /> <br />7. Existing Conditions Plan prepared by Passe Engineering, Inc., dated <br />August 2, 2007, received August 2,2007. <br /> <br />Emmons & Olivier Resources, Inc. <br /> <br />2 <br /> <br />8/23/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.