My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2007
>
2007-09-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2010 2:43:32 PM
Creation date
9/7/2007 3:53:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CITY OF CENTERVILLE <br /> <br />tervi{{e <br /> <br />'L.;ta6lLo;Jied" Ui5;- <br /> <br />MONTHL Y ENGINEER'S REPORT <br />For September 12, 2007 City Council Meeting <br /> <br />Italics = New information. <br />Normal = No change from last report. <br /> <br />1. Pheasant Manh 31"11 Addition (000616-03134-0). The only items left to be completed are <br />removal and replacement of the bike path trail to correct the ponding areas. The Contractor <br />also has to place the bituminous wear course. We have requested a schedule to finish the <br />remaining work and will forward the schedule to the City once we receive it from the <br />Contractor. The bituminous wear course will be installed following the completion of the bike <br />path correction work. <br /> <br />2. Bunten Crossing 3n1 Addition (000616-05141-0). The Contractor continues to work on <br />punch list items before scheduling wear course. We have requested a schedule for the wear <br />course paving and will forward to the City as soon as we receive it. <br /> <br />3. 21st AvenuelBackage Road (000616-05143-0). A pay request which includes all final <br />quantities will be on this agenda. We have reduced the retainage to 2%, which leaves us with <br />enough money to haul out the topsoil pile that exists on the North side of Parcel B & C. The <br />contract will remain open until the pile is gone or until October I, 2008, at which time we will <br />have it removed The contractor has agreed to these terms and is confident the material can be <br />hauled out by then <br /> <br />Contractors from the Old Mill Road project are currently hauling and placing fill material on <br />Parcel D and will continue for the next couple of weeks. We are working with the county to <br />obtain the remainingfillfrom the CSAH 14 project. <br /> <br />4. 2006 Storm Water Analysis (000616-06146-0). The results of this study have been <br />incorporated into the Feasibility Study for the 2009 Street Improvement Project. <br /> <br />5. Old Mill Road Improvements (000616-06147-0). The Contractor is currently working on the <br />pond area of the project installing storm sewer and draintile. The private utilities are in the <br />process of being relocated along Old Mill Road to accommodate our new infrastructure. The <br />Contractor will be installing the Sanitary Sewer the week of the lOth with water main and <br />services to follow. <br /> <br />6. Fairview Street Improvements (000616-06148-0). Contractor will be paving the bituminous <br />driveway to the Lift Station by the end of week. The Contractor has a few punch list items and <br />Bid items remaining to finish before closing the project out. The work is anticipated to be <br />finished within the next few weeks. <br /> <br />7. Block 7 Redevelopment Grading and Utility Improvements (000616-06152-0). The <br />Contractor will be re-televising a portion of the sanitary sewer line to re-inspect a service <br />connection. The remaining punch list items will be addressed after the completion of the re- <br />televising. <br />
The URL can be used to link to this page
Your browser does not support the video tag.