My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2007
>
2007-09-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2010 2:43:32 PM
Creation date
9/7/2007 3:53:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />D - Full removal and replacement of the existing bituminous section. Curb and gutter will be left in place <br />except for spot repairs. The new section will consist of draintile, the existing gravel base and new <br />bituminous. Storm sewer improvements will also be constructed where applicable. <br /> <br />E. EDGE MILL AND OVERLAY: <br /> <br />Finally, some streets in the northeast are in a position to be rehabilitated by a minimally invasive <br />improvement known as an edge mill and overlay. This work will significantly extend the life of the street <br />with minimal cost. The edges along the front of each curb line are milled (ground) off to a depth of about 1 <br />V2 inches, leaving some of the bituminous section in tact. This is done only on the edges, with the middle <br />of the street remaining untouched. Then a bituminous overlay is paved over the entire roadway, adding to <br />the strength of the existing street. <br /> <br />Category E improvements are as described below: <br /> <br />E - Mill the edge of the bituminous along each cub line for a width of 6 feet. Curb and gutter will be left in <br />place except for spot repairs. The new section will consist of the existing gravel and bituminous and a lift <br />new bituminous. Storm sewer improvements will also be constructed where applicable. <br /> <br />The proposed roadways with their respective proposed improvements can be seen illustrated in Figure 2 <br />and can also be seen in a tabular format later in the report. <br /> <br />City of Centerville <br />2009 Street and Utility Improvement Projen <br /> <br />#' Bonestroo <br /> <br />Project No 616-07-]580 <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.