Laserfiche WebLink
<br />DRAFT <br /> <br />cable operators in the City (including costs and payments) are responsible for <br />lurnishing and/or arc actually lurnishing, on a pel' subscriber basis, as of the time <br />of the Grantee's Franchise application, and shall calculate the Granlee's pro rata <br />PEG support contribution on the same per subscriber basis (the "PEG Fee") based <br />on the Grantee's Subscriber base. At its diseretion, the Grantee may exceed the <br />pro rata per subscriber PEG support calculated by the Commission in this <br />paragraph. Any such support shall be calculated on a per suhscriber basis. <br /> <br />6.2.2 The amount of the I'''G Fee shall be escalated in the same manner and in the same <br />amount. pcrcentage or proportion as the financial and/or in-kind PEG support <br />obligations of ()ther cable operators in the City increase. The Commission shall <br />determine the amount of the PEG Fee escalation on an annual basis, at a time set <br />by the Commission, and shall establish the date upon wbieh tbe PEG Fee <br />escalation shall become elTective. The Grantee shall lully respond to and <br />completely answer all requests tor information Irom the Commission related to <br />tbe escalation caJculalion by the date or dates established by the Commission. <br />The PEG support required by this paragraph 6.2.2 and paragraph 6.2.1 shall be <br />calculated monthly by applying the PEG Fee to the Grantee's Subscriber base. <br />AIII'EG Fees shall be paid to the Commission quarterly on the same schedule as <br />franchise Ice payments. To the cxtent permitted by applicable law, the PEG Fec <br />may be itcmized on Subscriber billing statements. <br /> <br />6.2.3 Upon demand, and by a time ~pecified by the Commi~~ion, the Grantee mu~t <br />provide the necessary facilities and equipment to interconnect with othcr Cable <br />Systems in the City to pcrmit the seamless exchange of PEG signals (including <br />video, voice and data signals) across networks. 'fhe Grantee and other cable <br />operators in the City may decide how to accomplish this connection, taking into <br />account the exact physical and technical circumstances of the systems involved. <br />Any connection agreed to by the Grantee and other Cable Systems in the City <br />shall ensure that the quality of PEG signals delivered to Subscribers meets or <br />cxceeds thc signal quality of other channels on the System and shall include the <br />fiber-optic or other cabling and other electronics, equipment, solhvare and other <br />materials necessary to transport all PEG signals from their origination point to and <br />trom the Commission's master control to the appropriate subscriber network <br />channel, including channels provided discretely. If the Grantee and other cable <br />operators cannot agree on how to accomplish the connection, the Commission <br />may decide, in its sole discretion. The Commission may require that tbe <br />connection occur on govc111ment property or on Public Rights-of-Way. Any <br />connection costs incurred pursuant to this paragraph shall be borne by the Grantee <br />and shall be in addition to the PEG Fee andlranchise fees. <br /> <br />35 <br /> <br />o <br />