Laserfiche WebLink
<br />II. EXECUTM SUMMARY <br /> <br />The Central Anoka County Regional Trail corridor has been established since the Anoka <br />County Parks and Recreation Department's 20/20 Vision Plan was adopted in 1998. <br />This master plan was developed to illustrate the alignment, potential partnerships and <br />costs associated with the construction of the east alignment of the Central Anoka <br />County Regional Trail. <br /> <br /> <br />This regional trail provides multiple opportunities <br />departments and local cities to meet the needs ofth <br />southeastern Anoka County and to connect the st <br />a variety of destinations in the County. <br /> <br />This trail corridor traverses through the <br />Blaine, Uno lakes and Centerville to th <br />of the trail through Anoka County as pro <br />of existing paved off-street trail. This master p <br />that is proposed to follow CS 4/Main Street <br />to the Washington County bo <br /> <br />rtner with other county <br />population in central and <br />nd local trail systems to <br /> <br /> <br />Anok. eqq"ty <br />Ttall$ystemPlan <br /> <br />e estimated cost for this <br />project is $1,267,200 for a <br />length of 8 miles with an <br />approximate cost of $30.00 <br />per lineal foot. <br /> <br /> <br /> <br />.........--....'..... <br /> <br /> <br />. . <br /> <br />-- <br />I!~~ <br />fi21..... <br /> <br />.~. <br />..- <br /> <br />.... <br />~. <br /> <br />~It_ <br /> <br />Page 2 of 14 <br /> <br />,Z4 <br />