Laserfiche WebLink
<br />Section 6: Project Timeline (Maximum 2 pages.) <br /> <br />All projects are required to submit a time line covering the period from when the project is <br />authorized by Mn/DOT to the project's completion. <br /> <br />6a) Infrastructure Projects <br /> <br />2008 <br /> <br />September <br /> <br />Notified of Successful Grant Application <br /> <br />October <br /> <br />Prepare Pre-Authorization Documents <br /> <br />Environmental Document (PM or EA) <br /> <br />Nov.-Dec. <br /> <br />Agency Review of Environmental Document <br /> <br />2009 <br /> <br />January FHWA authorizes design <br /> <br />February - March Preliminary Survey and Construction Documents Preparation <br /> <br />March Cooperative Agreement. Permit Applications. Plans to MNDOT <br /> <br />April - May DSAE and SALT Review <br /> <br />June Final Plan Changes <br /> <br />July Bidding <br /> <br />August Open Bids <br /> <br />Sept - October Construction <br /> <br />Nov.-Dec. Project Close-out. <br /> <br />6b) Non - Infrastructure Projects <br /> <br />2009 - August to December <br /> <br />Minnesota Safe Routes to School <br />2008 Grant Application <br /> <br />13 <br /> <br />,j1 <br />