Laserfiche WebLink
<br />Section 7: Estimated Budget <br /> <br />Part A: <br /> <br />Estimated Infrastructure Costs (Planning, Design, and Construction) <br /> <br />Identify the category (or categories) of work included in the proposed project. Work with <br />your project sponsor to develop a cost estimate of the project. All cost estimates are to be <br />based on applicable Mn/DOT guidance and State Aid Standards. <br /> <br />CSAH 14 Pedestrian/Bike Trail Underpass <br />Project Cost Estimate <br />Engineer's Estimate <br /> <br />Item <br /> <br />Construction <br />Engineering, Administration (30%) <br /> <br />$350,000.00 <br />105,000.00 <br /> <br />455,000.00 <br /> <br />Total Project Cost <br /> <br />Minnesota Safe Routes to School <br />2008 Grant Application <br /> <br />14 <br /> <br />-If <br />