Laserfiche WebLink
<br />. Survey of private utilities marked in the field. <br />. locating in place property comers. <br />. Survey of road. boulevards up to ROW, City utilities, and potential areas for rain gardens or other <br />BMP's. <br />. Transferring of data for design purposes. <br /> <br />Preliminary Design <br /> <br />Once our survey data is collected, we will utilize this information to complete some preliminary design work <br />in critical areas. This design iteration will allow us to make final decisions on the appropriate level of <br />improvements for each area. <br /> <br />Schedule <br /> <br />. Monday, November 26, 2007 GSOC tiCKets will be called in to locate the private utilities. They will <br />have until November 29, 2007 to have everything located. <br />. Thursday, November 29. 2007 the survey crews will begin locating property corners. <br />. Monday, December 3, 2007 the survey crews will begin setting control and starting the preliminary <br />survey work. <br />. December 21, 2007 all preliminary survey work will be completed. <br /> <br />~ <br /> <br />Our fee estimate is based on our past experience with these types of surveys. In order to complete the <br />preliminaf'j topographic survey work as described above our fees will not exceed $25,000. <br /> <br />For the preliminary design work described above, our fees will not exceed $18,000. <br /> <br />If the City Council is ready to move forward with the next stages of this important project, it would be <br />appropriate to authorize the preliminary survey and preliminary design work at an upcoming meeting. <br /> <br />Sincl'rely, <br /> <br />BONESTROO <br /> <br />;;A"/ J' <br />- "/./ 7!---- <br />~ , <br /> <br />Mark Statz, PE <br />City Engineer <br />651-604-4709 <br /> <br />Copy: Paul Palzer, Public Works Director <br />RJG, Bonestroo <br />File <br /> <br />3~ <br />