My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-09 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
2008-01-09 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2008 11:01:31 AM
Creation date
1/8/2008 11:01:22 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />this meeting, the feasibility study will be finalized with any final changes suggested by the <br />public and/or council. This would begin the formal Chapter 429 assessment process. <br /> <br />10. CSAH 14 Construction Services (000616-07159-0). Water main and Forcemain work <br />between the lakes is complete. All City relocation work will resume next spring. The <br />Contractor has shut down their crews until next spring also. <br /> <br />11. Downtown Redevelopment Comprehensive Infrastructure Plan (000616-07161-0). A <br />meeting was held with the City Council and Beard Group to discuss the status of the downtown <br />project. The Beard Group indicated that they were reevaluating the phasing and densities in <br />some townhome areas. They were to report back to the Council in about a month. At that time <br />we will revisit the infrastructure needs for 2008 based on their revised phasing and townhome <br />layout and develop a plan to construct what is needed. <br /> <br />12. Miscellaneous <br />· We have been assisting the public works department with their Water Emergency and <br />Conservation Plan. <br />· We have beenfollowing up on warranty work items associated with the water tower. <br /> <br />- End of memo - <br />
The URL can be used to link to this page
Your browser does not support the video tag.