Laserfiche WebLink
<br />this meeting, the feasibility study will be finalized with any final changes suggested by the <br />public and/or council. This would begin the formal Chapter 429 assessment process. <br /> <br />10. CSAH 14 Construction Services (000616-07159-0). Water main and Forcemain work <br />between the lakes is complete. All City relocation work will resume next spring. The <br />Contractor has shut down their crews until next spring also. <br /> <br />11. Downtown Redevelopment Comprehensive Infrastructure Plan (000616-07161-0). A <br />meeting was held with the City Council and Beard Group to discuss the status of the downtown <br />project. The Beard Group indicated that they were reevaluating the phasing and densities in <br />some townhome areas. They were to report back to the Council in about a month. At that time <br />we will revisit the infrastructure needs for 2008 based on their revised phasing and townhome <br />layout and develop a plan to construct what is needed. <br /> <br />12. Miscellaneous <br />· We have been assisting the public works department with their Water Emergency and <br />Conservation Plan. <br />· We have beenfollowing up on warranty work items associated with the water tower. <br /> <br />- End of memo - <br />