Laserfiche WebLink
<br />.' <br /> <br />City of Centerville <br />2009 Street and Utility Improvements Project <br /> <br />Page 4 <br />February 27,2008 <br /> <br />Q: Is it fair to force me to abandon my we/I while others in town may keep theirs? <br />A: Currently, all well abandonment costs associated with the project are separate, elective costs to <br />residents. The City is requiring that all wells within the DWSMA be abandoned. The City Council <br />could consider participating in these costs or paying the entire cost of abandonment. <br /> <br />The following is a summary of our recommendations: <br />1. Move forward with Types A, B, D & E improvements in 2009. <br />2. Consider Bond structure allowing short assessment deferment. <br />3. Delay Type C1 improvements (except those areas imbedded in other improvements) until 2014. <br />4. Reduce overall project costs by delaying some Type C1 improvements and revising the work scope <br />by changing the water main installation locations as follows (see attached map): <br />a. Type B to D3 <br />o Mill Road (North of Prairie Drive) <br />b. Type B to A1 <br />o Clearwater Drive <br />5. Schedule meetings between engineer and public on various streets. <br />6. Delay hook-up requirement to 2012 <br />7. Do not assess well abandonment costs or participate in the cost. <br /> <br />If the City Council would like to move forward with any of the aforementioned changes to the scope of the <br />project, it would be appropriate to order further revisions to the Feasibility Report. <br /> <br />Sincerely, <br /> <br />BONESTROO <br /> <br />~,./ ~ <br /> <br />Mark Statz, PE <br />City Engineer <br />651-604-4709 <br /> <br />cc: Dallas Larson, City Administrator <br />Paul Palzer, Public Works Director <br />Emily Maloney, Bonestroo <br />Ryan Goodman, Bonestroo <br />