Laserfiche WebLink
<br />BMP Summary Sheet <br />MS4 Name: City ofCenterville <br />Minimum Control Measure: 3-ILLlCIT DISCHARGE DETECTION AND ELIMINATION <br />Unique BMP Identification Number: 3a-l <br /> <br />BMP Title: Storm Sewer System Map <br />BMP Description: <br />BMP 3-1: Storm Sewer Man <br />The current storm sewer map is located in a Computer Aided Drafting (CAD) file. The City will continue to update <br />the map, as necessary, as development occurs. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />The information included or referenced on this Summary Sheet is intended to meet all SWPPP requirements for this <br />BMP. <br />Measurable Goals: <br />. Updated storm sewer map for new construction projects (y/n) <br />Timeline/Implementation Schedule: <br />. 2006-20 II: This activity currently exists and implementation is ongoing. <br />Specific Components and Notes: <br />. Locations of all ponds, streams, lakes and wetlands that are part of the MS4 <br />. Location of all structural pollution control devices <br />. Location of all pipes and conveyances that are 24 inches in diameter and over that are part of the MS4 <br />. Location of all outfalls and other discharge points leaving the MS4 <br />Responsible Party for this BMP: <br />Name: Paul Palzer <br />Department: Public Works <br />Phone: (651) 429-3232 <br />E-mail: ppal zer!alcenterv ill emn .com <br /> <br />Page 31 of67 <br />