Laserfiche WebLink
<br />BMP Summary Sheet <br /> <br />MS4 Name: City ofCenterville <br /> <br />Minimum Control Measure: 3-ILLlCIT DISCHARGE DETECTION AND ELIMINATION <br /> <br />Unique BMP Identification Number: 3c-1 <br /> <br />BMP Title: Illicit Discharge Detection and Elimination Plan <br /> <br />BMP Description: <br /> <br />BMP 3-3: Illicit Dischar~e and Detection Program <br />This BMP will involve categorizing areas of concern related to illicit connections and illicit discharge. By <br />developing an awareness of where to target efforts, improvements and progress can be made. Further, knowing the <br />areas of concern can help direct educational and participatory actions. The City will investigate existing illicit <br />connections and discharges. The City will also identify and prioritize future sites to assess and conduct field <br />inspections on the storm sewer system. As part of the lODE program, the City will have annual training or training <br />updates, as appropriate, for City staff involved in smoke testing, visual inspections, and sanitary sewer <br />maintenance. As part of the lODE program, the City will conduct, at a minimum, an annual staff workshop <br />concerning: <br />. the hazards associated with illegal discharges and improper disposal of waste, and <br />. identifying and avoiding illicit discharges. <br /> <br />Location(s) in SWPPP of detailed information relating to this BMP: <br /> <br />The information included or referenced on this Summary Sheet is intended to meet all SWPPP requirements for this <br />BMP. <br /> <br />Measurable Goals: <br />. Number of inspections conducted. <br />. Number of illicit discharges and illicit connections. <br />. Number of employees trained on inspection procedures, smoke testing, sanitary sewer maintenance, and the <br />hazards associated with illegal discharges and improper disposal of waste, and identifying and avoiding illicit <br />discharges. <br />. Create training programs. <br />. Create annual staff workshop. <br /> <br />Timelinc/Implementation Schedule: <br /> <br />. 2006: Collect existing information on illicit connections. <br />. 2007: Identify and prioritize future illicit connection assessment sites. <br />. 2008-20 II: Conduct field illspeclions of existing storm sewer system. <br />. 2008: Create employee training programs or arrange for outside vendor. <br />. 2008: Create annual staff workshop or arrange for outside vendor. <br />. Ongoing: Employee training. <br />Due to limited funding and human resources, implementation cannot occur immediately. <br /> <br />Specific Components and Notes: <br />. Smoke testing to detect areas of improper inflow to the MS4. <br />. Visual inspections to detect for dry weather flow or other out of the ordinary stonnwater occurrences. <br />. Calls by the public to the comment fonnat (BMP 2-5) can potentially identify when, where and how illicit <br />discharges are occurring. <br />. Construction inspections to verify proper connection to utilities. <br />. Spill response is contracted out to fire department. <br /> <br />Page 34 of 67 <br />