Laserfiche WebLink
<br />BMP Summary Sheet <br /> <br />MS4 Name: City ofCenterville <br /> <br />Minimum Control Measure: 4-CONSTRUCTION SITE STORM WATER RUNOFF <br />CONTROL <br /> <br />Unique BMP Identification Number: 4f-1 <br /> <br />BMP Title: Establishment of Procedures for Site Inspections and Enforcement <br />BMP Description: <br />BMP 4-3: ESe Insvection and Enforcement Prol!ram <br />The City conducts erosion and sedimentation control inspections for construction projects. Developments or <br />redevelopments are inspected on a weekly basis and/or after a significant rain event. Procedures for <br />enforcement include a warning letter, stop inspection letter, and financial security to ensure proper installation <br />and maintenance. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />The information included or referenced on this Summary Sheet is intended to meet all SWPPP requirements for this <br />BMP. <br />Measurable Goals: <br />. Number of inspections conducted <br />. Number of warnings issued <br />. Number oftimes financial security money is taken for ESC noncompliance <br />Timelinellmplementation Schedule: <br />. 2006-20 II: This is an existing program within the City and implementation is on going. <br />Specific Components and Notes: <br />. Inspection schedule <br />. Warning letter <br />. Financial security/Letter of credit <br />. The general public can submit comments and complaints related to ESC at construction sites (2-5). <br />Responsible Party for this BMP: <br />Name: Pau I Palzer <br />Department: Public Works <br />Phone: (65 I) 429-3232 <br />E-mail: DDalzer(W,centerv i Ilemn .com <br /> <br />Page 48 of 67 <br />