My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2008
>
2008-04-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2008 3:47:53 PM
Creation date
4/4/2008 3:19:31 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />BMP Summary Sheet <br /> <br />MS4 Name: City ofCenterville <br />Minimum Control Measure: 5-POST-CONSTRUCTION STORM WATER MANAGEMENT IN <br />NEW DEVELOPMENT AND REDEVELOPMENT <br />Unique BMP Identification Number: 5a-1 <br /> <br />BMP Title: Development and Implementation of Structural and/or Non-structura I BMPs <br />BMP Description: <br />BMP 5-1: Post-Construction BMPs <br />The City will develop a list of minimum structural and non-structural techniques that will be required for <br />construction activities within the City. The City will distribute the list to any contractors performing <br />construction activities. <br />BMP 5-5: Surface Water Management Plan <br />The City ofCenterville has a Surface Water Management Plan established that defines the standards, goals, <br />policies and certain requirements which apply to the content of this permit. Topics covered within the SWMP <br />include goals and policies, watershed requirements, agency requirements, proposed BMPs, general physical <br />descriptions (soils, topography, lakes, wetlands, etc.), storm water quantity and quality, and possible capital <br />improvement projects. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />The information included or referenced on this Summary Sheet is intended to meet all SWPPP requirements for this <br />BMP. <br />Measurable Goals: <br />BMP 5-1: Post-Construction BMPs <br />. Number of contractors provided with construction BMP list <br />. Document modifications to construction BMP list <br />BMP 5-5: Surface Water Management Plan <br />. SWMP established (y/n) <br />Timelinellmplementation Schedule: <br />BMP 5-1: Post-Construction BMPs <br />. 2006-2011: This is an existing program within the City and implantation is ongoing. <br />BMP 5-5: Surface Water Management Plan <br />.2006-2011: This is an existing plan within the City and implementation of it is ongoing. <br /> <br />Page 49 of 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.