My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-09 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2008
>
2008-04-09 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2008 3:47:53 PM
Creation date
4/4/2008 3:19:31 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Timeline/lmplementation Schedule: <br />BMP 5-2: Plan Review Procedures <br />. 2006-2011: This is an existing activity within the City and implementation is ongoing. <br />BMP 5-4: Buffer Zone Requirements <br />. 2006-20 II: This is an existing requirement within the City and adherence to it will continue. <br />BMP 5-5: Surface Water Management Plan <br />.2006-2011: This is an existing plan within the City and implementation of it is ongoing. <br />BMP 5-6: Regulations for Post-Construction Runoff Control <br />. 2006-20 II: This is an existing program within the City and implementation is on going. <br />Specific Components and Notes: <br />BMP 5-4: Buffer Zone Requirements <br />. Defined in Surface Water Management Plan <br />. Included in post-construction site review <br />. Coordination with MnDNR shore land regulations <br />BMP 5-5: Surface Water Management Plan <br />. Watershed drainage districts and sub-districts <br />. Design standards <br />. Cost estimate for new storm sewer <br />. Maintenance Issues of stormwater improvements <br />. Goals and policies relating to MCMs <br />. Meet requirements of Rice Creek Watershed District <br />BMP 5-6: Regulations for Post-Construction Runoff Control <br />. Rate control (prevents downstream erosion) <br />. Water quality (NURP) guidelines <br />. Sodding/stabilization ordinance language <br />. Tree planting ordinance language <br />. This BMP coordinates with the Plan Review Procedures (BMP 5-2) <br />. This BMP coordinates with Buffer Zone Requirements (BMP 5-4) to mitigate post-construction runoff. <br />. This BMP coordinates with Objective 3 (policies a and b) in the SWMP. <br />Responsible Party for this BMP: <br />Name: Paul Palzer <br />Department: Public Works <br />Phone: (651) 429-3232 <br />E-mail: ppa Izer(Wcenterv i Ilem n .com <br /> <br />Page 52 of 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.