Laserfiche WebLink
<br />BMP Summary Sheet <br /> <br />MS4 Name: City of Centerville <br /> <br />Minimum Coutrol Measure: 5-POST-CONSTRUCTION STORM WATER MANAGEMENT IN <br />NEW DEVELOPMENT AND REDEVELOPMENT <br /> <br />Unique BMP Identification Number: 5c-1 <br /> <br />BMP Title: Long-term Operation and Maintenance of BMPs <br />BMP Description: <br />BMP 5-3: Post-Construction Pond Maintenance Prolp"am <br />The City collects stonnwater fees from new construction properties for maintenance on the stormwater system and <br />ponds. A portion ofrhe City's ponds are inspected annually to determine the amount of maintenance needed. <br />Location(s) in SWPPP of detailed information relating to this BMP: <br />The information included or referenced on this Summary Sheet is intended to meet all SWPPP requirements for this <br />BMP. <br />Measurable Goals: <br />. Percent of new construction properties charged stormwater fees <br />. Amount of annual stormwater drainage fees collected <br />. Number of ponds included in post-construction maintenance program <br />Timeline/Implementation Schedule: <br />. 2006-2011: This is an existing program within the City and implementation is ongoing and in coordination <br />with BMP 6-1. <br />Specific Components and Notes: <br />. Initial financial security <br />. Annual stormwater drainage system charges <br />. Pond dredging <br />. This BMP coordinates with Objective 4 (policy a) in the SWMP <br />Responsible Parly for this BMP: <br />Name: Paul Palzer <br />Department: Public Works <br />Phone: (651) 429-3232 <br />E-mail: opalzer@centervillemn.com <br /> <br />Page 53 of67 <br />