My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Notice of PH - 2009 Street Project
Centerville
>
City Council
>
Legal Notices
>
Previous Notices
>
Notice of PH - 2009 Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2008 10:42:30 AM
Creation date
4/9/2008 10:42:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Peltier Lake Drive from Centerville Road to Peltier Circle by street <br />reconstruction, curb and related drainage improvements, and <br />12. Peltier Lake Drive from Peltier Circle to Mill Road by street <br />reconstruction, curb and related drainage improvements, and <br />13. All of Clear Ridge by street reconstruction, curb and related drainage <br />improvements, and <br />14. All of Grange-View by street reconstruction, curb and related drainage <br />improvements, and <br />15. All of Hayfield Road by street reconstruction, curb and related drainage <br />improvements, and <br />16. All of Prairie Drive by street reconstruction, curb and related drainage <br />improvements, and <br />17. All of Houle Circle by street reconstruction, curb and related drainage <br />improvements, and <br />18. All of Fox Run by street reconstruction, curb and related drainage <br />improvements, and <br />19. Peterson Trail between Prairie Drive and 73rd Street and between Fox Run <br />and Main Street by street reconstruction, curb and related drainage <br />improvements, and <br />20. Brian Drive between Main Street and a point 200 feet north of 73rd Street <br />by street reconstruction, curb and related drainage improvements, and <br />21. 73rd Street between 20th Avenue and a point approximately 200 feet west <br />of Brian Drive by street reconstruction, curb and related drainage <br />improvements, and <br />22.72"d Street between Brian Drive and Unity Avenue by street <br />reconstruction, curb and related drainage improvements, and <br />23. 72 '/z Street between Unity Avenue and Twin Lakes Avenue by street <br />reconstruction, curb and related drainage improvements, and <br />24. All of Twin Lakes Avenue by street reconstruction, curb and related <br />drainage improvements, and <br />25. All of Brian Way by street reconstruction, curb and related drainage <br />improvements, and <br />26. All of Unity Avenue by street reconstruction, curb and related drainage <br />improvements, and <br />It is the intent of the City to assess the benefiting properties for all or a portion of the cost <br />of the improvement, pursuant to Minnesota State Statute §429.011 to 429.111. The <br />estimated cost of the improvements total $7,800,000. Such person(s) that desire to be <br />heard with reference to such improvement will be heard at said time and place. <br />Preliminary plans may be inspected at the office of the City Administrator, 1880 Main <br />Street, Centerville, MN 55038. <br />Dallas Larson, City Administrator <br />Publish in the Quad Community Press on April 15 and Apri122, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.