My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-11 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
2008-06-11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2008 3:16:22 PM
Creation date
6/6/2008 3:15:29 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />utility relocations continues. Our inspector has been working closely with the Public Works <br />Department. The Contractor has been working on City water main installation, relocation, and <br />testing. The Contractor has also been doing a significant amount of storm sewer installation. <br />They are currently working in the Lakeland Circle & CSAH 14 area working towards <br />downtown Centerville. <br /> <br />9. New Public Works Facility (000616-07160-0). Our building services group assisted the <br />public works department in developing a comprehensive punch list for interior work on the <br />facility. Paul will be working with the owner to complete the items identified in our inspection. <br />An inspection of the exterior work will take place, once it is completed. <br /> <br />10. Downtown Redevelopment Comprehensive Infrastructure Plan (000616-07161-0). The <br />Beard Group will be giving regular updates on their land acquisition as they move forward. We <br />are formulating a project for 2008 to construct some of the main line storm sewer and pond <br />system with the grant funds we have received. John Meyer continues his work to find more <br />grant dollars with our technical assistance. <br /> <br />11. Creative Kids Day Care Site (000616-07164-0). An onsite preconstruction meeting was held <br />with Public Works, the Contractor, and Bonestroo on April 30, 2008. The Contractor started <br />work the week of May 5, 2008. The Contractor has completed all utility work. Water main <br />has passed all the required field tests and the Contractor is making progress on constructing <br />the building onsite. <br /> <br />- End of memo - <br />
The URL can be used to link to this page
Your browser does not support the video tag.