Laserfiche WebLink
<br />.!:~ <br /> <br />B <br /> <br />C1 TV or CLNTLr~VILLr <br /> <br />_,=-eas i b2-~_"Ltv _~e.p.9It <br /> <br />Tennis Courts <br /> <br />M~c h-1~_197 7 <br /> <br />I ~1PROVEl1ENT : <br />LOCATION: <br />SPECIAL CONDITIONS: <br /> <br />Double Tennis Courts. <br /> <br />School PrOp9rty .(See Attached Map). <br /> <br />The City is considering tryi.ng to utilize volunteer <br />labor.. <br /> <br />INITIATION: <br />FEASIBILITY: <br />COMPLETION: <br /> <br />Council <br /> <br />This improvement is feasible. <br /> <br />Spring of 1977. <br /> <br />FINANCING: <br /> <br />See Estimated Costs below. <br /> <br />1. Costs of project utilizing volunteer labor and going with the <br />cheaper materials. <br /> <br />- <br /> <br /> <br />a.) Common Excavation (300 C.Y.). . . . . . .. . A .. .300.00 <br />- b.) 6" Bas e t1 ate ria 1 ( C 1 ass I I) (5 50 Ton) . . . . . . . . 2 , 400 . 00 <br />c.) 2" Bituminous Base (MHO 2341) (200 Ton) . . . .Ll,800.00 <br />d.) 120' (10 ft. Fence) [7.50 per ft. material] . .900.00 <br />e.) 200' (3 ft.. Stubs) [3.00 per ft. rnaterial]. . . . .. . .600.00 <br />f.) One Gate, Painting, Net & Posts" . . . . . . ,,500.00 <br />TOTAL = $9,500.00 <br /> <br />2. Costs of project if let bids and had entire work completed by <br />Contractor. <br /> <br />a.) COtrn1on Excavation (300 C.V.). . . . . . e " . . . <br />b.) 6" Base Material (Class II) (550 Ton) :3.74 y.. <br />e .) 2 II Bit urn i no us Bas e (MH 0 234 1) ( 200 Ton) . . . . <br />d.) Lay Kold 66 - Colorin9 System & Lines" . " " . <br />e.) 120' (10 ft. Fence) llO.OO Materic.l & Install] <br />f .) 200' ,( 3 ft. S tubs) [4 . 20 r.1 ate ria 1 & Ins t a 11 J. . <br />g.) One Gate, Painting, Nets & Posts. <br /> <br />Engineering (hourly). . " . . . . <br /> <br />. . . 300 ~ 00 <br />.2,400.00 <br />.4,800.00 <br />.2,300.00 <br />.1,200.00 <br />. . 840 .00 <br />. . . 1 ,000. 00 <br />TOTAL = -$12,840.00 <br />. " . . . " .600.00 <br />TOTAL = $1.3-..!i4.O.OO <br />