Laserfiche WebLink
<br />Exerpt from Parks & Recreation Committee Meeting Minutes July 2, 2009 <br /> <br />Tracie McBride Memorial Park Renovations <br /> <br />The following update was for the committee in an email from Mr. Paul Palzer: <br /> <br />The work at Tracie McBride Memorial Park should be completed fUlly by the meeting. The only <br />items I'm waiting on are the touch up painting and the class 5 gravel near the pump house. I did <br />talk with Harlan about the whirl and he stated the mounting instructions call for installation from <br />6-18" above the fall protection. We are at /8" if you level out the sand and I questioned him <br />why we were not iriformed of the height preference and stated his installer only gave us the <br />height of the curbing as their only direction for height. He said that installation instructions <br />should have been sent to City Hall weeks prior to the delivery and I know that both Andy and I <br />called him to receive those instructions prior to the equipment delivery, but never received them. <br /> <br />Committee Member Harris stated the play structure for the 3 - 5 year olds is in place and appears <br />to be great, but the merry-go-round is installed too high and something needs to be done with that <br />as it is really not usable as it is for the group intended. It is however, the equipment the kids <br />appear to gravitate to. The climbing wall did not get ordered in this phase, but hopefully will <br />be ordered as soon as funding is available. Ms. Stephan suggested requesting funds from <br />Dead Broke Saddle Club who were very generous with donations for the play structure in <br />Laurie LaMotte Memorial Park. Committee Member Harris also stated that Mr. Palzer had <br />told her there was a plexi-glass message board at Public Works which could be installed at the <br />park for community messages. Ms. Stephan will talk to Mr. Patzer regarding this item. <br />Committee Member Harris requested Public Works raise a few of the swings a couple of links. <br />Ms. Stephan will pass this on. The basket ball hoop could use a coat of paint and a hoop. <br />Council Member Lee volunteered to take care of this project himself. <br />