My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-24 CC
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2008
>
2008-09-24 CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2008 8:59:40 AM
Creation date
9/22/2008 8:58:43 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />09/19/2008 FRI 11:44 FAX 651 770 2552 EMMONS&OLIVIER RESOURCES <br /> <br />Permit Application No. 08-054 <br /> <br />City of Centerville <br /> <br />revised Permanent Erosion & Sediment Control Plan <br />specifying the no-mow/low-grow option in lieu of MnlDOT <br />270 for all proposed Raingardens. <br /> <br />5. Full Sets of Rain Garden Grading Plan idcntifying curb cut <br />elevations or EOFs for each basin AND Street Improvements <br />Plan showing road profiles and low entry elevations for all <br />buildings subject to flooding by proposed rain gardens (see <br />Finding 4 for further discussion). <br /> <br />Erosion & Sediment Control <br /> <br />6. Revised Plan including a revegetation implementation <br />schedule. <br /> <br />Administrative <br /> <br />7. Draft legal documents providing satisfactory form and <br />description granting ponding and flowage easements over all <br />BMPs locatcd outside City ROW. <br /> <br />8. Pelmit Application signed by Successful Bidder. <br /> <br />Stipulations: <br /> <br />1. An as-built survey of all stonnwater <br />management BMPs (rain gardens, swales) is <br />to be submitted to the District for verification <br />of compliance with thc approvcd plans before <br />return of the surety. <br /> <br />Exhibits: <br /> <br />1. Pennit Application dated September 2, 2008, received September 2, <br />2008. <br /> <br />2. Memo of StOlmwater Rcquirements prepared by Boncstroo, dated <br />September 2,2008, received September 2, 2008. <br /> <br />3. Gcotechnical Evaluation ,Report and Soil Borings prcpared by Braun <br />Inteltee Corporation, dated November 29, 2007, received September <br />2,2008. <br /> <br />4. Lettcr addressing maintenance of stonnwater facilities prepared by <br />Bonestroo, dated September 2, 2008, received September 2, 2008. <br /> <br />5. Previous Projcct COlTespondence prepared by Boncstroo, datcd July <br />] 1, 2006, received September 2,2008. <br /> <br />6. Hydrologic Calculations prepared by Bonestroo, last revised <br />September] 5, 2008, received September] 5,2008. <br /> <br />Emmons & Olivier Resources, Inc. <br /> <br />- 2 - <br /> <br />9/] 9/08 <br /> <br />~003/008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.