My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res. #08-033 - Declaring Cost to be Assessed & Ordering Prep. of Proposed Assessment & Calling Hearing - 2009 Street Project
Centerville
>
City Council
>
Resolutions
>
2000-2023
>
2008
>
Res. #08-033 - Declaring Cost to be Assessed & Ordering Prep. of Proposed Assessment & Calling Hearing - 2009 Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2008 3:18:28 PM
Creation date
12/15/2008 8:52:50 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />AUTHORIZED IMPROVEMENT DESCRIPTION <br />AS MODIFIED ON December 10, 2008 <br />1. Peltier Lake Drive from CSAH 14 to a point 150 feet northeast of Centerville Road <br />by street reconstruction, curb and related drainage improvements, and <br />2. Peltier Lake Drive between the easterly and westerly intersections of Peltier Circle <br />by street reconstruction, curb and related drainage improvements, and <br />3. Centerville Road from Peltier Lake Drive to Lakeland Circle by street <br />reconstruction, curb and related drainage improvements, and <br />4. Peltier Lake Drive from Centerville Road to Peltier Circle by street reconstruction, <br />curb and related drainage improvements, and <br />5. Peltier Lake Drive from Peltier Circle to Mill Road by street reconstruction, curb <br />and related drainage improvements, and <br />6. All of Clear Ridge by street reconstruction, curb and related drainage <br />improvements, and <br />7. All of Grange View by street reconstruction, curb and related drainage <br />improvements, and <br />8. All of Prairie Drive by street reconstruction, curb and related drainage <br />improvements, and <br />9. Fox Run between Peterson Trail and Brian Drive by street reconstruction, curb and <br />related drainage improvements, and <br />10. Peterson Trail between Prairie Drive and 73rd Street by street reconstruction, curb <br />and related drainage improvements, and <br />11. Brian Drive between Main Street and a point 200 feet north of 73rd Street by street <br />reconstruction, curb and related drainage improvements, and <br />12. 73rd Street between 20th Avenue and a point approximately 200 feet west of Brian <br />Drive by street reconstruction, curb and related drainage improvements, and <br />13. 72"d Street between Brian Drive and Unity Avenue by street reconstruction, curb <br />and related drainage improvements, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.