Laserfiche WebLink
<br />Centerville, MN <br />TE Trail Grant Project Name <br /> <br />6. Estimated Bridge Construction Costs <br /> <br />Estimated Bridge Dimensions <br /> <br />Bridge Length <br />Bridoe Width <br />Total Estimated Square Ft <br /> <br />Estimated Cost for Lowest Cost Bridge Option <br /> <br />65-ft <br />12-ft <br />7BO-sq. ft. <br /> <br />Page 9 <br />3/4/2009 <br /> <br />1. Bridge excavation and backfill <br /> <br />2, Prefabricated Steel Bridge Delivered ($B5/sq, ft) <br /> <br />3. Prefabricated Steel Bridge Installed <br /> <br />4. Bridge Foundation (Concrete abutments w/out piles) <br />(With piles add $15,000) <br /> <br />5. Rip Rap Slope Protection <br /> <br />6, ADDroach Fence <br /> <br />Sub-total <br />10% Continoencv <br /> <br />Total Estimated Bridge Cost <br /> <br />$B,OOO <br /> <br />$66,300 <br /> <br />$10,000 <br /> <br />$25,000 <br /> <br />$5,000 <br /> <br />$5.000 <br /> <br />$119,300 <br />$11.900 <br /> <br />$131,230 <br />