Laserfiche WebLink
<br />Proposed Schedule <br />TE Trail Grant Park Improvements <br />Centerville <br /> <br />Pt'i;I:;e TaskSublas><; 'h-Lt 2 -3 '.'dl'::1 'J ',la'd 16 20 '.~...:'cr 23 27 "~dr~C ';pr 3 :"pr':3 10 Aprl13 17 <br /> <br />Phase 1: Visioning and Preliminary Design <br />001001 Staff meeting. labor estimate, site viSIt, admin <br />001002 Background DatalReviewlBase mapping, <br />001003 Prepare process/schedule graphic. photo boards. plan graphiCs for meeting <br /> <br />March 4 <br />- <br />001005 <br />001006 <br />001007 <br />001008 <br />001009 <br /> <br />March 18 <br /> <br />001011 <br />001012 <br />001013 <br />001014 <br />001015 <br />001016 <br />001017 <br /> <br />April 1 <br /> <br />- <br /> <br />. <br /> <br />Park Comm. Klckofflvlalonlng Meeting 1: <br />-- - - . - <br />Prepare concepts plans: up to 2 <br />Options for elements & materials: up to 3ea <br />Construction Cost Est. <br />Prepare summary graphics for meeting <br />Prepare perspective illustration of park <br /> <br />Park Comm. Meeting 2: Select & prioritize elements <br /> <br />Neighborhood Stakeholders Meeting <br />Refine Preferred Plan <br />Refine Design of preferred elements <br />Specialty elements: Kiosk. Arbor, plaza, . ete <br />Specialty elements: rain gardens, public art spaces. interpretive elements. etc. <br />Revise cost Estimates <br />In-house Staff Meetings <br /> <br />Park Comm. Meeting 3: Review refined design, summary memo <br /> <br />wuM ?ll~ti;'IJ <br />. <br /> <br />" <br /> <br />. <br /> <br />Phase 2 - Design Development and Construction Documents <br /> <br />002001 <br />002002 <br />002003 <br />002004 <br />002005 <br />002006 <br />002007 <br />002008 <br />002009 <br />002010 <br />002011 <br />002012 <br />002013 <br />002014 <br /> <br />002015 <br />002016 <br />002017 <br />002018 <br />002019 <br />002020 <br />002021 <br />002022 <br />002023 <br /> <br />April 3 <br />002024 <br />002025 <br />002026 <br />002027 <br /> <br />Removals <br />layout Plan <br />Grading plan <br />Electrical <br />Utilities <br />Paving Details <br />Specialty elements: Kiosk, Arbor, plaza, , etc. <br />Specialty elements; rain gardens, public art spaces. interpretive elements. etc. <br />Civil & Structural engineering for Specialty elements <br />Electrical Engineenng for specialty elements <br />Staff Meeting . Review Design Development <br />Revise Cost Estimates <br />Preliminary Specifications <br />In-house Staff meetings <br /> <br />Construction Documents and Cost Estimates <br />Removals <br />Layout Plan <br />Grading plan <br />Electrical <br />Utilities <br />Paving Details <br />Specialty elemenls, Kiosk, Arbor, plaza, , etc. <br />Specialty elements; rain gardens. public art spaces, interpretive ~!ements. etc. <br /> <br />Subm1180% Plans <br /> <br />Revise cost Estimates <br />In-house Staff Meebngs <br />Final Specifications <br />Bidding <br />Meelings (1-2 Addxitlonal) <br /> <br />. <br /> <br />J <br />