Laserfiche WebLink
<br />City of Centervll/e <br />rr Troll Granf <br /> <br />Page 2 <br />2/7M)9 <br /> <br />The plans for this project wiR need to meet certain guidelines outside of our normal fonnat <br />protocol due to the requirements of the federal funding aSSOCiated with the Transportation <br />Enhancement Grant. Federal requirements necessitate a host of additional detailed information <br />that must appear on the plan set and be submitted for review, including: <br /> <br />. Statement of Estimated Quantities <br />. Alignment and Structure Tabulations <br />. Cross Sections <br />. MNDOT Standard Plates <br /> <br />. MNDOT Standard Bid Items <br />. Traffic Control Plans <br />. Fonnal Pavement Design <br />. Formal Drainage Calculations <br /> <br />Additionally, the design will be complicated by the disjointed nature of the project, with short <br />segments of trail, in all parts of town, through existing neighborhoods. The project also indudes <br />several elements which require specialized design, including a park facility and pedestrian bridge. <br />The park design will include three evening meetings with the parks committee (one of which <br />could be a joint meeting with the City Council). Those meetings will facilitate visioning sessions <br />to listen to the parks committee's ideas on the focatlon and functionality of the park as well as its <br />desired amenities. The bridge design scope Indudes: location selection, abutment design, <br />evaluatiOn of soil reports, hydraUlic Impact analysis, and the selection of a pre-fabricated/pre- <br />engineered pedestrian bridge. If the hydraulic analysis identifIeS u~m impacts to the flood <br />elevation, we w)JI need to modify the scope and fee associated with the bridge design; this <br />proposal does not anticipate that outcome. <br /> <br />To help clarify the scope of this project, we have attached a figure outlining the project as it is <br />defined at the time of this proposal. Should the scope change, the proposed fees contained in <br />this letter wiR need to be modified. <br /> <br />Upon completion of the contract documents, we will assist the City in obtaining bids through the <br />publiC bidding process. We will then tabulate the bids received and prepare a bid results letter. <br /> <br />Permits <br />A number of permits will be needed for the completion of this project. We anticipate the need <br />for permits from the following agencies: <br /> <br />. Wetland Conservation Act lGU <br />. US Army COrps of Engineers <br />. Rice Creek Watershed District <br />. Anoka County Highway Department <br />. St. Paul Regional Water Services <br />. Met Council Environmental Services <br /> <br />Obtaining these pennits may Involve filling out the application, providing back-up information, <br />drafting figures, responding to comments from submittals, resubmittals, and meetings with <br />agency staff. <br /> <br />69 <br />