My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-21 CC PH - Approved
Centerville
>
City Council
>
Minutes
>
2000-2009
>
2009
>
2009-01-21 CC PH - Approved
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2009 9:42:23 AM
Creation date
3/5/2009 9:42:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Centerville City CounciUPublic Hearing Meeting Minutes <br />January 21, 2009 <br />City Engineer Statz reviewed the project and the various changes that were made to <br />respond to comments from the public. <br />City Engineer Statz that the project has four improvement types, identified as Types B, C, <br />D, or E. All are reconstruction of streets in varying degrees, although work will be done <br />that includes spot sanitary sewer repairs, water main bolt replacement, storm sewer repair <br />and watershed requirements, including a number of raingardens. The bid on the work also <br />included water services from the right-of--way directionally drilled into to homes, but that <br />work would be completely at the option of homeowners that wish to take advantage of <br />the bid. <br />City Engineer Statz presented an overview of the project schedule and stated if the <br />project moves forward, construction would begin in spring of 2009. <br />City Administrator Larson stated that the mailed notices indicated the assessment amount <br />for each property and also reviewed how the assessments were calculated. He explained <br />that the notices indicate that assessments would be paid over 10 years at 5.5% except that <br />larger assessments would be spread over 15 years. <br />Mayor Capra stated each resident will be given two to three minutes to speak and stated if <br />a resident has a written objection, that document should be submitted at this time and that <br />the end of the hearing would be the final opportunity to submit objections. <br />Gary Oslund, 1594 Peltier Lake Drive <br />Mr. Oslund stated that he didn't believe that his property is benefited to the extent of the <br />proposed assessment. Asked Council to consider the odd shape of his lot as it considers <br />his special assessment. <br />Tom Dario, 1573 Peltier Lake Drive <br />Mr. Doesn't believe that his property is benefited by the improvement. <br />Liz Wegner_ 1525 Peltier Lake Drive <br />Ms. Wegner questioned if the construction of their part of the project was included in the <br />bid as it was actually built with County Road 14. <br />Pat Fish, 1537 Peltier Lake Drive <br />Ms. Fish presented a written objection. Also questioned if there will be a requirement to <br />connect to watermain. <br />Mayor Capra. The City policy to require connection to water has been deferred to at least <br />2020. The project has water service line installation as an option for property owners that <br />wish to connect. <br />Irene Seashore, 1689 Peltier Lake Drive. <br />Has submitted a written objection. No additional comments. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.