My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-18 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2009
>
2009-03-18 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2009 1:28:25 PM
Creation date
3/13/2009 3:48:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Fl.'stiv:u of Lakl.'s <br /> <br />City of Centerville <br />. <br /> <br />~ <br />. . <br />..~ ". <br /> <br />Project Requirements Document (PRO) <br /> <br />Project Name: 2009 Outdoor Decorative Fountain <br /> <br />Document Creation/Revision Date: 03/10109 <br /> <br />Revision 0.9 <br /> <br />Prepared by: City of Centerville Parks & Recreation Committee <br /> <br />P & R Project Contact: Mark Haiden (Hl 651-762-9393. (Cl 651-249-3010 <br /> <br />Work to be perfonned or managed by: Centerville Public Works Department <br /> <br />Expected Project Completion Date: To be advised <br /> <br />Project Description: <br /> <br />This project is to construct an outdoor water fountain in the newly acquired park land on Main <br />Street just north of the St. St. Genevieve church building <br /> <br />Document Scope: <br /> <br />This document represents best efforts of the Centerville Parks & Recreation Committee to list <br />the project requirements that are deemed necessary for a favorable outcome to the project. <br />Local regulations, safety considerations and best construction practices will take precedent over <br />these requirements; however it is the obligation of those who are overseeing the work <br />performed to bring such discrepancies to the attention of the P & R Project Contact for further <br />discussion. <br /> <br />Project Requirements: <br /> <br />1) The fountain shall be of a design and materials to allow for an attractive appearance <br />throughout its service life with minimal maintenance. <br /> <br />2) The fountain shall designed to reduce the risk/impact of graffiti or vandalism <br /> <br />3) The fountain shall not present a drowning hazard. <br /> <br />4) The fountain shall be designed for easy maintenance and cleaning of valves, piping, <br />pumping and drainage functions. <br /> <br />5) The fountain shall have a recirculation pump water to conserve water. <br /> <br />2009 Outdoor Decorative Fountain <br /> <br />Page 1 <br /> <br />03/1312009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.