My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-18 P & R Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2009
>
2009-03-18 P & R Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2009 1:28:25 PM
Creation date
3/13/2009 3:48:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />F (' slival of Lak (' s <br /> <br />City of Centerville <br /> <br />'..~ <br /> <br />Project Requirements Document (PRO) <br /> <br />Project Name: 2009 Trail BridQe Proiect <br /> <br />Document Creation/Revision Date: 03/10/09 <br /> <br />Revision 0.9 <br /> <br />Prepared by: Citv of Centerville Parks & Recreation Committee <br /> <br />P & R Project Contact: Mark Haiden (Hl651-762-9393. (Cl651-249-3010 <br /> <br />Work to be performed or overseen by: Centerville Public Works Department <br /> <br />Expected Project Completion Date: To be advised <br /> <br />Project Description: <br /> <br />This project is to construct a bicycle/pedestrian bridge allowing a new trail (designated "L" on <br />the TE Trail Grant Project Scope map) to cross Clearwater Creek near Centerville City Hall <br />connecting an existing trail to the south to the new Regional Trail being built along Main Street. <br /> <br />Document Scope: <br /> <br />This document represents best efforts of the Centerville Parks & Recreation Committee to list <br />the project requirements that are deemed necessary for a favorable outcome to the project. <br />Local regulations, safety considerations and best construction practices will take precedent over <br />these requirements; however it is the obligation of those who are overseeing the work <br />performed to bring such discrepancies to the attention of the P & R Project Contact for further <br />discussion. <br /> <br />Project Requirements: <br /> <br />1) The bridge shall be designed and constructed to allow safe and easy passage of <br />pedestrians and bicycles. <br /> <br />Clarification: All ridinglwalking surfaces should be relatively smooth so as to not present <br />trip hazards or difficult bicycling. <br /> <br />2) The bridge shall be of a design and materials to allow for an attractive appearance <br />throughout its service life. <br /> <br />Clarification: There should be no or minimal use paint that would require regular re- <br />painting. Materials should be selected such that natural weathering does not require <br />regular maintenance. <br /> <br />2009 Trail Bridge Project <br /> <br />Page 1 <br /> <br />03/13/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.