Laserfiche WebLink
<br />City of Centervilie Goals <br />, <br />Adopted May 23, 2001 <br /> <br />The Process (continued) <br /> <br />9 Where is the money in the budget for streetscape plans, LaMotte ParI<: ,electrical, <br />Wheels Park, public works water traps etc,? <br />. Infrastructure plans were discussed for roads, sewers, and especially pond <br />maintenance and that plans exist <br />. Park and recreation from park improvements; to l{ids bicycle and pedestrian <br />access for safety were discussed. Looping trails were talked about. <br />" Overlaying the St. Paul water pipe was offered as a good idea to get bikes and <br />pedestrians off Centerviile Road <br />. Access to the lakefront was mentioned and the possibility of trading land with the <br />church was also talked about <br />~ Do\,vntown water, sewer, r,evitalization, and architecture themes were mentioned <br />including a major grant application several years ago for mixed-use Dusiness on <br />first floor with apartments and living spaces above much like an early 1900's <br />theme <br />. Comprehensive plan update process was mentioned <br />. . Communication options were touched on and we heard negative comments 011 <br />our website <br />. Citizens want the budg,::;t printed and available to them as decisions are <br />formulated and they want lhe budget that is adopted followed. <br />· Folkstaiked about quality of life issues - keep it a small town <br />. Youth and crime prevention were talked about and need for programs such as <br />YMCA/Lino Lakes Park etc. <br />. Couldn't hear Ihe tornado siren was talked about . <br />. Comments were received that the plan emphasis/look ahead \llias good <br />. The draft document does not preclude .any existing jlouth programs that exist <br />such as Little League or soccer, but tries to enhance recreation programs. <br />· The park dedication fee was discussed for the Laivlotte Park improvements. <br />· Open space planning was mentioned as an issue <br />· A.rchilecturai and environmental design was mentioned as e possible item Ii) <br />jncorpcrate in ord:r.aiic2s <br /> <br />l;il additkm, I visit;ed Cl'~..Ili1Cey !Bam"U Gardewl$ :and tieamed: <br /> <br />. They have concerns with the next phase of development in Eagle Pass <br />~ Pedestrian access to church, into Eagle Pass, and along Cenlerville Road 10 gel <br />downtown or to church is important <br />c. They seem to have constant muddy water in the facility and would like that <br />addressed <br />. They are interested in pond maintenance issues <br />'$ They do not ;Nant assisted living or rnuitisto~v buildings in the r~ext phase of <br />Chauncey Barrett <br /> <br />R <br />