<br />easements at various locations along the highway. It is assumed property owners will grant <br /> <br />temporary easements/temporary access during the construction, at no cost to the project. <br /> <br />COST SUMMARY <br /> <br />A detailed cost estimate of the proposed water main extension along CSAH 14 is shown in <br />Appendix A. Unit prices are based on similar type projects bid in the Metro area over the past <br />several years. Directional drilling contractors were also contacted to offer expertise on the water <br />main installation. The Total Project cost is $189,000.00, which includes 10% contingencies and <br />20% indirect costs (administrative, engineering design and inspection, testing, and legal). <br /> <br />PROJECT SCHEDULE. <br />City Council order Feasibility Study <br />Present Feasibility Report <br />Informational Meeting <br />Public Hearing, Council order Plans/Specs <br />Submit Plans for Council approval, order advertisement <br />Open bids <br />Award Contract <br />Begin Construction <br />Complete Construction <br />Assessment Hearing ~~I.i(! \-ko.Y~ <br /> <br />ASSESSMENTS <br /> <br />October 24, 2001 <br />November 28, 2001 <br />December 2001 <br />January 23, 2002 <br />March 13, 2002 <br />April 18, 2002 <br />April 24, 2002 <br />May 2002 <br />August 2002 <br />November 2002 <br /> <br />The costs associated with this project can be funded through a combination of several possible <br />sources. They include current property owners, The Shores development, and The City of <br />Centerville. Several assessment/funding scenarios are provided in Appendix B. <br /> <br />As shown on Figure 3, a significant proportion of the water main route borders property that can <br />not be assessed. On the east end, the Lake1and Hills development has already paid for water <br /> <br />CSAH 14 Water Main Extension <br /> <br />Page 5 <br />