Laserfiche WebLink
<br />It can be argued that the larger diameter pipe is not considered a trunk main west of Peltier Lake <br />Drive. A 12" diameter pipe is necessary for fire flow only, since this is a dead end main. The <br />main can't be looped like a normal water system due to the lakes in the area. <br /> <br />The intersection of Peltier Lake Drive is approximately the halfway point of the water main <br />project. Therefore, one assessment scenario, Option 3 in Appendix B, has the City's cost at <br />$26,730 ($53,46012). This amount is the City's cost to oversize the water main between <br />Lakeland Hills and Peltier Lake Drive. <br /> <br />CONCLUSIONS AND RECOMMENDATIONS <br />The project is feasible from an engineering standpoint and is in accordance with the City of <br />Centerville Comprehensive Plan. The following recommendations are presented for <br />consideration by the City Council: <br /> <br />I. That this report be adopted as a guide for installation of water main to serve The Shores <br />Development and existing properties along CSAH 14. <br />2. A meeting be held with property owners to discuss the improvements and proposed <br />assessments, and receive input from residents. <br />3. Option 3 in the Proposed Assessments be adopted as the most feasible method to finance <br />the project. <br /> <br />. <br /> <br />CSAH 14 Water Main Extension <br /> <br />Page 7 <br />