My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-13 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2009
>
2009-05-13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2009 3:22:42 PM
Creation date
5/11/2009 3:21:21 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1335 Highwoy 36 W <br />5t. Poul, MN 5511J <br /> <br />T.1651-636-4600 <br />Fo, 651-636-131 1 <br /> <br />www.bonestroo.com <br /> <br />May 2, 2009 <br /> <br />Dallas larson <br />Administrator <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br /> <br />Re: Peltier Lake Drive Area Street and Utility Improvements <br />Change Order 2 <br />City of Centervllle <br />8onestroo File No.: 000616-09169-0 <br /> <br />#' Bonestroo <br /> <br />Dear Dallas: <br /> <br />In February, the City Council approved our proposal for EngineerIng Design services for the <br />proposed Transportation Enhancement Trail Grant project. We are nearing completion of the <br />design and have encountered an Item that we felt should be brought to the attention of the <br />Council, Trail Segment E runs on the east side of Mill Road, north of C.S.A.H. 14. Underneath the <br />proposed trail will be the water main connections for the future loop. See attached figure. In <br />order to avoid damaging the trail In the Mure to complete the Mill Road water main, It is <br />recommended that this mnnectlon be made prior to the trail's installation. The recently bid, <br />Peltier Lake Drive Area Street and utility Improvement project would be good opportunity to <br />complete this work given the following: <br /> <br />. Water main was Included in the bid already so prices are known, <br />. The City has decided not to assess water main Installation therefore adding it to <br />the project would not affect assessments and <br />. The proposed work is adjacent to the Mill Road water main connection <br /> <br />The following outlines our scope of services and the associated fees for these additional activities <br />should the Council wish to proceed with the proposed Change Order. <br /> <br />Change Order 2 SCope <br />Change Order 2 would consist of Installing 8" PVC water main in the boulevard of Mill Road <br />between the existing stubs at Prairie Drive and 100' south of Peltier lake Drive. Water main <br />services would also be installed. Services to homes on the west side of Mill Road are proposed to <br />be dlrectionally drilled under the existing pavement section and selVices on the east side of the <br />road would be open cut. The change order would also Include other related site work to the area <br />induding: driveway restoration, road restoration, sod. tree removal, and stonn culvert removal <br />and replacement. <br /> <br />It Poul <br />It Clouo <br />Rochester <br />MJJwilukee <br />Chicago <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.