Laserfiche WebLink
<br />CIty of Centervflle <br />PeIIfer Lalee DrIve AI90 Slreet and Ullllty Improvements <br /> <br />Page 2 <br />6I2ID9 <br /> <br />Colt Eltfmllte and DesIgn .... <br />The construction of the oork described above Is estlmaled to cost $46,314.20. <br /> <br />The fee for design of the work desatbed above Is $3,500. The work will be billed on an hourly <br />basis with not-to-exceed Umit. The limit Includes our billable E!lCpeIlSeS. <br /> <br />If'the CouncIl wishes III proceed with this work, It would be approprlale for them to authorize this <br />additlon III our Original scope and fee proposal. A separate authorization for the change order <br />Itself can be made at a later date onte the lXlIItractDr has agreed to Its terms. <br /> <br />Sincerely, <br />BONES"TROO <br /> <br />~~~ <br /> <br />Mark StlItz, PE <br />City EngIneer <br /> <br />Attachments: Cost EstImate <br />Figure showing location of proposed work <br /> <br />copy: Paul Paller - Public Works Director <br />ELM, RJG. CWl2 - Bonesboo <br />file <br />