Laserfiche WebLink
<br />.-: <br /> Contract Unit Quantity Amount <br />No. Item Unit Quantity Price to Date to Date <br />58 15" RCP flared end section EA 3 360.00 3 51,080.00 <br />59 15" HOPE flared end section with trash guard EA 1 265.00 1 5265.00 <br />60 12" HOPE flared end section EA 2 160,00 2 5320.00 <br />61 Class III random riprap CY 115 60.00 109 56.540.00 <br />62 Improved pipe foundation LF 700 1.90 50.00 <br />63 Seeding AC 0.5 1300.00 50.00 <br />64 Silt fence, regular LF 300 5.00 $0.00 <br />65 Hay bales LF 200 7.00 SO.OO <br />66 Protection of catch basin in street EA 12 50,00 SO.OO <br />67 Ditch excavation LF 300 4.00 50 5200.00 <br /> Total Part 4 - Storm Sewer S69,590.45 <br /> Part 5 - Street <br />68 Mill bituminous pavement l' wide LF 100 4.70 50.00 <br />69 Subgrade preparation SY 9100 1.00 9100 59,100.00 <br />70 Geolextile fabric, Type V SY 9100 1.75 9100 515,925.00 <br />71 Select granular borrow (CV) CY 5500 5.50 5500 $30,250,00 <br />72 Aggregate base, Class 5 TN 3100 12.00 3405 $40,860.00 <br />73 Type 31 bituminous base course TN 870 30.70 898,3 527,577.81 <br />74 Bituminous wear course, Type 41 (2002) TN 690 34.95 SO.OO <br />75 Bituminous material fOf tack coat GAL 400 1,60 SO.OO <br />76 Surmountable concrete curb and gutter LF 4200 7.40 3866 528,608.40 <br />77 Water for dust control 1000 GAL 100 20.00 50.00 <br />78 4" Perforated polyethylene pipe LF 4200 4.85 4200 520,370.00 <br />79 Type lIJ barricade EA 6 150.00 SO.OO <br />80 Skidsteer (bobcat) with operator HR 10 75.00 SO,OO <br />81 Street sweeper wlpick up broom & operator HR 10 100.00 5 5500.00 <br />82 Seeding AC 1.5 1300.00 SO.OO <br />83 4- concrete sidewalk SY 8000 2.35 SO.OO <br />84 Aggregate base, Class 5 - trail TN 250 12.00 SO,OO <br />85 Bituminous wear course, Type 41A, Pathway <br /> (2002) TN 75 51.50 SO.OO <br /> Total Part 5 - Street 5173,191.21 <br /> <br />Total Part 1 - Sanitary Sewer <br />Total Part 2 - Waler Main <br />Total Part 3 - Services <br />Total Part 4 - Storm Sewer <br />Total Part 5 - Street <br />Total Work Completed To Date <br /> <br />5201,418.65 <br />5139,751.50 <br />$44,448.00 <br />S69,590.45 <br />S173,191.21 <br />S628,399.81 <br /> <br />61600t17REQ4.x1s <br />