My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-06-12 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2002
>
2002-06-12 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2009 9:46:09 AM
Creation date
5/12/2009 9:43:48 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3.04 SURFACE PREPARATIONS <br /> <br />A. All street surfaces carefully cleaned, scraped; swept and approved by the <br />ENGINEER prior to Seal Coating. <br /> <br />B. Application of water may be required to minimize the creation of air borne dust <br />and assist in the sweeping and cleaning operation. <br /> <br />C. Hand cleanup used as necessary. <br /> <br />D. Cover all Manhole and Gate Valve Box Covers with fine/sand aggregate prior to <br />seal coating so that seal coat material does not adhere to the cover surface: <br /> <br />1. Clean all fine aggregate and seal coat material from Manhole and Gate <br />Valve Box Covers once work is completed. <br /> <br />2. Dispose of all fine aggregate and seal coat material at an acceptable <br />location outside the City limits. <br /> <br />3.05 BITUMINOUS MATERIAL APPLICATION <br /> <br />A. Conform to MnDOT Spec. 2356.D except as modified herein: <br /> <br />I. Application rates shall be modified only as directed by the ENGINEER or . <br />an authorized representative. <br /> <br />2. Application rates will be determined based on existing surface conditions, <br />and traffic volumes. <br /> <br />3.06 AGGREGATE APPLICATION <br /> <br />A. Conform to MnDOT Spec. 2356.E except as modified herein: <br /> <br />I. The CONTRACTOR is responsible to perform the test strip and <br />calibration of the chip spreader in accordance to the "Standard Method for <br />Determining the Transverse Spread Rate for Surface Treatment <br />Application" (Modified Method ASTM D-5624-95): <br /> <br />a. Complete this procedure on the first day of seal coat application <br />and one additional time during construction as requested by the <br />ENGINEER. <br /> <br />b. All cost associated with this test are considered incidental to the <br />aggregate placement bid item. <br /> <br />616-01-121 <br />ro 2002 Bonestroo, Rosene, <br />Anderlik & AS5ociates. Inc. <br /> <br />02785-4 <br /> <br />BITUMrNOUS PAVEMENT TREATMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.