Laserfiche WebLink
<br />WHAT HAS HAPPENED TO DATE? <br /> <br />I <br /> <br />if The process includes a technical analysis side and a public involvement side to be done <br />concurrently to meet the project objectives. <br /> <br />if Three public informational meetings have been held to date. <br /> <br />if Four alignment alternatives were chosen to be evaluated as a result of the first public <br />meeting, 140th Street Alignment, 142nd Street Alignment, 145th Street Alignment (existing) <br />and 147th Street Alignment. <br /> <br />if The 140th Street alignment was eliminated from further study because of environmental <br />impacts, right-of-way and construction costs, and travel patterns. <br /> <br />if The 142nd Street, 145th Street, and 147th Street alignments are moving forward for further <br />analysis in an Environmental Assessment (EA). <br /> <br />ADD GENERAL ALIGNMENT AL TERNA T1VES MAP <br />