My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-09-11 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2025
>
2002
>
2002-09-11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2009 8:01:18 AM
Creation date
5/13/2009 7:59:52 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WHAT ARE THE PROPOSED IMPROVEMENTS? <br /> <br />, <br /> <br />./ Based on existing and projected traffic volumes, the proposed improvements <br />include reconstruction of the roadway with four through lanes, tum lanes, a <br />center median, pedestrian/bicycle path, and new drainage systems <br />(culverts/storm sewer.) <br /> <br />./ A transition section will be constructed between the 1-35 E east ramp and Otter <br />lake Road. <br /> <br />./ The project received $3.6 million in Federal funding. Washington County, <br />Anoka County, Hugo, and Lino lakes will provide the remaining funding. <br /> <br />./ The goal of the project is to provide a safe and efficient roadway that meets current and <br />future traffic needs, while minimizing social, environmental, and economic impacts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.