Laserfiche WebLink
<br />DRAFT <br />3/29/02 <br /> <br />New Facility Summary <br /> <br />I <br />I <br />I <br /> <br />As indicated above, we believe that the most cost effective option in the <br /> <br />future to meet current and projected facility needs will likely be for the <br /> <br />Commission to build or acquire a new facility. The following is a list of <br /> <br />development considerations for the Commission to use in reviewing the <br /> <br />nature, type, location, functions and capabilities that are needed <br /> <br />concerning a new facility in order to facilitate a desired level of <br /> <br />programming in the future. <br /> <br />Physical Location of the Production Facility <br /> <br />. Is there a sufficient amount of available parking and <br /> <br />loading/unloading space? <br /> <br />. Is it near any other facilities that might promote close proximity <br /> <br />use by persons that will be involved in video production? <br /> <br />. Is the prospective location near an existing or easily provisioned <br /> <br />point of interconnection to the A T& T I-Net or fiber backbone that <br /> <br />would provide.a high quality signal upstream to the headend? <br /> <br />. Is the site in an acoustically acceptable area where the noise of <br /> <br />the outside environment (such as a nearby superhighway, <br /> <br />railroad tracks, airline traffic, truck loading area, construction <br /> <br />CBG Communications, Inc. <br /> <br />North Metro Media Center Narrative <br />Oe;-)'</1)2 <br />P.13 <br /> <br />Page 40 of 47 <br />