Laserfiche WebLink
<br />DRAFT <br />3/29/02 <br /> <br />. Is there additional high ceiling space behind lockable bay doors <br /> <br />or a lockable cage to provide storage for studio sets? <br /> <br />. What is the availability of large freight elevators, if the garage or <br /> <br />loading area is underground or if some facilities would be <br /> <br />located on a second f100l-? <br /> <br />. Are there wider doorways and hallways where production and <br /> <br />post production work would take place? <br /> <br />. In the area where master control may be located, are there <br /> <br />raised floors or communications raceways in the floor or ceiling? <br /> <br />. Is the inside space for the studio and audio booth acoustically <br /> <br />acceptable or would a significant amount of baffling and other <br /> <br />modifications need to be implemented? <br /> <br />. Is the building ADA accessible such that appropriate ramps, <br /> <br />elevators, bathroom modifications, etc. have been made? <br /> <br />. Is there wide, easy access, from the garage or loading area to <br /> <br />the projected studio area? <br /> <br />. Is there a high quality communications infrastructure within the <br /> <br />building (Le., does the space incorporate telephone, data, <br /> <br />coaxial, fiber and other necessary cabling)? <br /> <br />CBG Communications, Inc. <br /> <br />North Metro Media Center Narrative' <br />OP'r'Jt:/'J2 <br />P.lS <br /> <br />Page 42 of 47 <br /> <br />L__ _ _ _ <br />