Laserfiche WebLink
<br />DRAFT <br />3/29/02 <br /> <br />. Is the electrical system capable of handling the power load of <br /> <br />the lighting/production/post production/transmission, etc. <br /> <br />equipment planned? <br /> <br />. Is there availability of both generator and battery backup power <br /> <br />within the building? <br /> <br />. Is there space available and the appropriate zoning for the <br /> <br />installation of wireless communications, including satellite <br /> <br />downlinks as well as potential microwave antenna placement? <br /> <br />. Is the HVAC system capable of handling the heat <br /> <br />dissipation/cooling required for a large amount of video <br /> <br />production equipment (Master control/post production/etc. must <br /> <br />typically be cooled to 650 - 680 F)? <br /> <br />. Are there appropriate fire suppression systems (geared around <br /> <br />extinguishing electrical fires without catastrophic damage to <br /> <br />unaffected equipment)? <br /> <br />. Is the building attractive, such that it would make a good first <br /> <br />impression on visitors to the facility? <br /> <br />Facility Development <br /> <br />. Once real estate, basic building and/or lease costs are <br /> <br />accounted for, then interior development/renovation/remodeling/ <br /> <br />CBG Communications, inc. <br /> <br />North Metro Media Center Narrative <br />Of"""1~2 <br />P.16 <br /> <br />Page 43 of 47 <br /> <br />I <br />-~-- -- -- -- -- -- -- <br />