Laserfiche WebLink
<br />DRAFT <br />3/29/02 <br /> <br />leasehold improvement/etc. cost (at potentially $125 per square <br />foot or morel-need to be factored in. <br /> <br />. The costs noted above need to cover finalization of space for: <br /> <br />Reception <br /> <br />Office <br /> <br />Master control/playback/tape duplication <br /> <br />Editing/post production (potentially 3 editing suites) <br /> <br />Field/Remote equipment storage <br /> <br />Set and other storage <br /> <br />Studios <br /> <br />Studio Control Rooms <br /> <br />Tech shop <br /> <br />Network equipment room <br /> <br />Garage <br /> <br />. The Studio Control rooms should be adjacent to their respective <br /> <br />studios. Master Control will incorporate the playback <br /> <br />operations. If duplication is also done in this area, then the <br /> <br />duplication area needs to be separated from the playback <br /> <br />operations. <br /> <br />CBG Communications. Inc. <br /> <br />North Metro Media Center Narrative <br />Of",)~/1)2 <br />P.17 <br /> <br />Page 44 of 47 <br />